top of page
Safety Academy Logo.jpg

Firearms Range Alterations
Milwaukee, Wisconsin

Phase One of the project provided a new 15 lane firearms range. Range equipment included new monorail target deployment/retrieval systems, target carrier systems, running man system, master range control computer with remote controls, inclined granular bullet traps and safety baffles and ceilings. New fire sprinkler, lighting and exhaust filtration systems were designed. New Ready Rooms and Staging Areas were also designed.  Phase Two provided a complete new ventilation and exhaust system.  Phase Three provided additional firing bay sidewall ballistic rubber and steel armor plating allowing for 180 degree weapons discharge. This facility accommodates the Milwaukee Police Departments requirement that emphasize tactical training.  Boer Architects, Inc. provided all architectural and interior design services for this $1,000,000 project. We also coordinated all work provided by structural, range equipment, plumbing, HVAC and electrical engineering consultants. Services included design, construction document and construction administration services. An existing 30 year old “qualification” firearms range located in the City of Milwaukee Safety Academy Building was completely demolished and replaced with a “tactical” state-of-the-art small arms and rifle range. A multi-phase project was planned in coordination with the City of Milwaukee Department of Public Works and the Milwaukee Police Department.

  • Firearms_Range.jpg
  • IMG_3986.jpg
bottom of page