top of page
Bathroom 1.jpeg

Appleton Electric Foundry Toilet Upgrades
South Milwaukee, Wisconsin

  • Bathroom 2.jpeg
  • Bathroom 1.jpeg

In this renovation project, the entire men’s foundry toilet was demolished and new finishes, plumbing fixtures, accessories, and HVAC and lighting systems were installed. The ceramic tile floor was pitched to existing floor drains to allow for easier “hose down” cleaning. All new room configurations and buildouts were designed to comply with applicable requirements of the Americans with Disabilities Act. BAI also coordinated all work provided by plumbing, HVAC and electrical engineering consultants retained directly by the owner’s design-build contractor. Services included design, construction document and construction administration services.

bottom of page