top of page
download.png

Marshall High School
Lab Remodeling
Milwaukee, Wisconsin

  • IMG_4099.JPG
  • IMG_4090.JPG
  • IMG_4093.JPG
  • IMG_4095.JPG
  • IMG_4098.JPG

Boer Architects, Inc. provided all architectural, interior design, and engineering services for this 3,600 sf laboratory alteration project. The project built out rooms 108 and 108B to create a new Science Maker Space at MPS’ Marshall High School. The Science Maker Space includes both a laboratory area and a lecture area. There is also a centrally located instructor’s station that is used for demonstrations.  A prep and storage area was expanded to hold materials, models and provide proper safety storage. Work provided new floor finishes, acoustic ceiling systems, drywall partitions, doors, frames, cabinetry, countertops, student work stations, accessible fume hoods, flat screen TVs and upgrades to plumbing, HVAC and electrical systems.

bottom of page